Connect with us

City of Red Deer

Michener North lands selected as location for future multi-use aquatic facility

Published

4 minute read

Monday, Red Deer City Council approved Michener North lands as the site for a future multi-use aquatic facility in Red Deer.

“Confirming the location for the future multi-use aquatic centre is an important milestone in bringing the vision for a new aquatics centre to life for our community,” said Mayor Tara Veer. “Both Rotary Recreation Park and Michener North lands were viable options for the facility; however, selecting Michener North lands offers us the opportunity to re-imagine a future for this significant piece of Red Deer’s history and create a legacy for future generations. Today’s decision also signals Council’s desire to move forward with this long anticipated project when economic conditions are more favourable in the future, as well as our commitment to re-purpose Michener North for public purposes and park expansion. One of the challenges for funding a new aquatic centre was the many pragmatic financial uncertainties of the project. We have now determined location and scope, which will help us to plan more definitively for funding of future construction.”

In December, Council directed administration to consider two possible locations for the multi-use aquatic facility: Michener North lands and Rotary Recreation Park. In addition to an in-depth evaluation of both sites, several factors were considered in selecting Michener North lands:

  • The City is purchasing the Michener North lands from the Province, with funds approved in the 2021 Capital Budget.
  • Solidifying this location allows the multi-use aquatic facility to be included in the visioning for Michener North. This visioning will help develop ideas around what this site could for the community and will begin in early 2022.
  • The multi-use aquatic facility serves as an anchor to this future major park node.

Scoping, design and cost were also determined in December as part of Phase 1 of this project. At this time, the facility includes a 53M x 25M pool with 10 lanes, ranging in depth from 2.5M to 3.8M with diving platforms at the deep end and two 1.5M movable bulkheads. This competition pool is compliant with FINA standards and Swim Alberta recommendations. The facility also includes a 25M x 20.6M pool with eight lanes, ranging in depth from 1.2M to 2.2M to accommodate swim competitions, warm up for aquatic sport competitions, and floor based depths serving local community programming needs. Two hot tubs, steam and sauna amenities, universal change rooms, spectator seating for up to 750 people, storage, sport group dryland training area, and staff supports are accounted for in the design.

The facility construction costs are estimated at $51,600,000, and by selecting Michener, The City is in a better position to quantify the variable site development costs as plans are solidified to place the item in the capital plan.

We now know that Michener North lands will be used for municipal purposes and become a major park node for community use,” said Sarah Tittemore, Community Services General Manager. “Major park nodes need indoor facilities to serve the needs of park users, and deciding on the multi-use aquatic facility at this site allows the visioning for the Michener North lands to include this anchor and the community. We look forward to working with the community to enrich the vision through planned future consultation.”

More from this author
City of Red Deer / 1 day ago

Rebate programs launch again in Red Deer

2024 City Councilor By-Election / 2 weeks ago

Chad Krahn wins City Council by-election: Official results Friday

2024 City Councilor By-Election / 2 weeks ago

Red Deer City Council by-election: Polls open today until 8 PM

City of Red Deer

Rebate programs launch again in Red Deer

Published on

Red Deer residents who purchase and install a rain barrel, drought-tolerant plants, permeable mulch or a low-flow toilet may qualify for a rebate on their City utility bill.

Alberta is experiencing drought in many parts of the province due to a below average snowpack in winter 2022-23, these rebate programs help Red Deerians conserve water usage in their homes and on their property at a time when water conservation is top of mind for many. The province is currently in water shortage management stage 4 (out of 5) and multiple water management areas are impacted by water shortage.

Participants in the programs could see a reduction in water usage in their homes as well as time and money as yards and gardens require less watering and fertilizer.

Specific details vary per rebate, but each program is open to Red Deer residents who have a City of Red Deer utility account.

Plant and Mulch Rebates are open for qualifying residents who purchase and install qualifying plants and/or permeable mulch in 2024. There is one rebate available for 50% of the cost of plants up to $50 and one rebate available for 50% of the cost of mulch up to $50.

The Rain Barrel Rebate program is open for residents who purchase and install a new rain barrel in 2024. The rebate is for 50% of the cost of the rain barrel up to $50. To encourage residents to participate in the program, this rebate has been expanded for 2024. Participants who received one rain barrel rebate in past years are welcome to apply for one additional rebate. Maximum of two rebates per utility account for the lifetime of that utility account.

Toilet Rebate is available for residents who replace a high-flow toilet with a low-flow model. Two $25 rebates are available per utility account. People who have participated in this program in previous years are not eligible to receive another rebate.

These rebate programs support the water-related goals in The City’s Environmental Master Plan by reducing Red Deerians water use and increasing water conservation efforts. More information on how you can conserve water can be found at reddeer.ca/drought.

Continue Reading

2024 City Councilor By-Election

Chad Krahn wins City Council by-election: Official results Friday

Published on

Unofficial 2024 By-Election Results

With 100% voting stations reporting, Red Deerians have elected a new City Councillor during The City’s first ever by-election.

Unofficial results of the 2024 Municipal By-Election are as follows:

Councillor for The City of Red Deer Number of positions to be filled: 1

Candidate Votes
1 BUCHANAN, S.H. (Buck) 479
2 CHILIBECK, Jason 287
3 COLLINGS, Mark 115
4 CULLEN-SAIK, Linda 296
5 HUIZING, Hans 381
6 KRAHN, Chad 2512
7 MACDONALD, Ashley 165
8 MILANEY, Liam (The Level) 29
9 TWEEDLE, Jaelene 2355
10 YZERMAN, Calvin 183

Official election results for the Municipal By-Election will be announced by noon on Friday, April 26, 2024.

Continue Reading

Trending

X