Connect with us

Alberta

Province teaming up with Calgary company for a $2 Billion dollar upgrading facility near Edmonton

Published

8 minute read

From the Province of Alberta

Made-in-Alberta plan moves $2-billion investment forward

Premier Rachel Notley’s Made-in-Alberta energy strategy is taking a major step forward in diversifying the economy, creating new jobs and adding more value to our resources.

Calgary-based Value Creation Inc. (VCI) and its wholly owned subsidiary Value Chain Solutions Inc. are on track to invest $2 billion in an upgrading facility in the Alberta Industrial Heartland, just east of Edmonton, which will create more than 2,000 construction jobs and another 200 full-time positions once the facility is up and running.

This is just the first of several new projects made possible through the Made-in-Alberta strategy to do more upgrading and refining of the province’s oil and gas resources here at home.

“We’re taking the bull by the horns and fighting to get full value for our oil. Albertans have been talking about this for decades, and we’re not content to sit on the sidelines and let good jobs and investment pass Alberta by for places like Louisiana. That has happened for too long and it has got to stop. We’re making sure the next generation of Albertans have the opportunities they deserve in a stronger, more resilient, more diversified province.”

Rachel Notley, Premier

VCI’s leading-edge facility will upgrade diluted oil sands bitumen into a higher-value crude blend that can flow easier through pipelines. This provides significant cost savings to industry because it would reduce the need for diluent, while increasing pipeline capacity by up to 30 per cent, and providing access to more refineries around the world that cannot currently accept Alberta’s oil sands bitumen.

The partial upgrading technology is expected to reduce greenhouse gas (GHG) emissions by 16 per cent per barrel compared to current processes used to extract bitumen.

“We here at Value Creation Inc. and Value Chain Solutions Inc. look forward to building upon Premier Rachel Notley’s vision of diversifying our energy markets and maximizing the value of the resources owned by Albertans. Our project is going to create good, long-term jobs with game-changing technology for low-cost upgrading and strong environmental performance.”

Columba Yeung, chairman and CEO, Value Creation Inc. and Value Chain Solutions Inc.

Through a letter of intent, the province has agreed to support the project through a $440-million loan guarantee, subject to reaching a final agreement. In all, Alberta is providing more than $3 billion in support for crude oil and bitumen partial upgrading and petrochemical upgrading, which turns Alberta natural gas into higher-value products like plastics.

“This government’s Made-in-Alberta upgrading program is a crucial element to ensuring these value-add investments happen in Alberta. Alberta’s Industrial Heartland is a key economic driver of the province’s economy, with potential for $30 billion in new investment by 2030. Upgrading more of our resources here at home means more jobs and more investment in our local communities, with new value chains that will help diversify our economy for generations to come.”

Mark Plamondon, executive director, Alberta’s Industrial Heartland Association

Construction of the Strathcona County-based project is already underway, with some foundational infrastructure in place and design work nearly completed. The plant is expected to be operational in 2022. Once completed, this would be the first commercial-scale partial upgrader in the world using this new technology, which VCI has been developing over several years.

VCI’s facility is just the first of others to be announced under Premier Notley’s Made-in-Alberta strategy, which is focused on creating jobs, adding value to our energy resources and exporting our products to new markets. This plan is at the heart of diversifying Alberta’s energy sector and making sure we get full value for the resources owned by all Albertans.

VCI project background

  • The first phase of the Value Chain Solutions – Heartland Complex (VCS-H) will use 77,500 barrels-per-day (bpd) of diluted bitumen to produce a medium synthetic crude oil and an ultra low sulfur diesel, which is a cleaner-burning transportation fuel used here at home and around the world.
  • Founded in 1999 and based in Calgary, Value Creation Inc. has nearly 1,200 square kilometres of oil sands land holdings in Alberta.
  • The company has developed a plan to engage with Indigenous communities across the region for employment, contracting and long-term alliance opportunities.
  • VCI’s technology is expected to help reduce GHG emissions by up to 16 per cent compared to current processes. This is the equivalent to cutting 620,000 tonnes of harmful emissions per year, or removing 135,000 cars from the road.
  • The project is expected to generate roughly $2.5 billion in revenue to the province over the 30-year life of the project.
  • Strathcona County is expected to receive about $280 million in municipal tax revenue over the life of the project.

Made-in-Alberta energy strategy

Partial upgrading of bitumen

  • $1 billion in grants and loan guarantees to encourage companies to build bitumen upgrading facilities to:
    • increase the value of our energy resources before shipping
    • allow more volume to be shipped through pipelines
  • Partial upgrading reduces the thickness of oil sands bitumen so it can flow through pipelines more easily, without having to be blended with diluent, or as much diluent, a thinning agent. Benefits include:
    • higher prices for our resources
    • more access to international markets
    • cost savings on diluent for industry
    • fewer emissions by removing high carbon content
  • Partial upgrading is cheaper to do than full upgrading because it requires less processing.
  • In 2016, oil sands companies in Alberta purchased $13.3 billion worth of diluent, much of it imported.
  • Bitumen that goes to market without upgrading or refining has historically been sold at lower prices compared to other crude oils.
    • Partial upgrading could help reduce this discount by improving the quality of the product and increasing the number of refineries capable of processing it.

Petrochemical upgrading

  • Total support will now reach $2.1 billion to unlock about $20 billion in private-sector investment.
  • This would help create as many as 15,500 jobs during construction of multiple petrochemical facilities across the province.
  • Inter Pipeline’s Heartland Petrochemical Complex is already under construction as a result of this program:
    • $3.5 billion private investment
    • 2,300 construction jobs, 180 operational jobs
    • The complex processes propane into plastic pellets called polypropylene, which is used around the world making kids’ toys, electronics and automotive parts.

After 15 years as a TV reporter with Global and CBC and as news director of RDTV in Red Deer, Duane set out on his own 2008 as a visual storyteller. During this period, he became fascinated with a burgeoning online world and how it could better serve local communities. This fascination led to Todayville, launched in 2016.

Follow Author

Alberta

Alberta’s grand bargain with Canada includes a new pipeline to Prince Rupert

Published on

From Resource Now

By

Alberta renews call for West Coast oil pipeline amid shifting federal, geopolitical dynamics.

Just six months ago, talk of resurrecting some version of the Northern Gateway pipeline would have been unthinkable. But with the election of Donald Trump in the U.S. and Mark Carney in Canada, it’s now thinkable.

In fact, Alberta Premier Danielle Smith seems to be making Northern Gateway 2.0 a top priority and a condition for Alberta staying within the Canadian confederation and supporting Mark Carney’s vision of making Canada an Energy superpower. Thanks to Donald Trump threatening Canadian sovereignty and its economy, there has been a noticeable zeitgeist shift in Canada. There is growing support for the idea of leveraging Canada’s natural resources and diversifying export markets to make it less vulnerable to an unpredictable southern neighbour.

“I think the world has changed dramatically since Donald Trump got elected in November,” Smith said at a keynote address Wednesday at the Global Energy Show Canada in Calgary. “I think that’s changed the national conversation.” Smith said she has been encouraged by the tack Carney has taken since being elected Prime Minister, and hopes to see real action from Ottawa in the coming months to address what Smith said is serious encumbrances to Alberta’s oil sector, including Bill C-69, an oil and gas emissions cap and a West Coast tanker oil ban. “I’m going to give him some time to work with us and I’m going to be optimistic,” Smith said. Removing the West Coast moratorium on oil tankers would be the first step needed to building a new oil pipeline line from Alberta to Prince Rupert. “We cannot build a pipeline to the west coast if there is a tanker ban,” Smith said. The next step would be getting First Nations on board. “Indigenous peoples have been shut out of the energy economy for generations, and we are now putting them at the heart of it,” Smith said.

Alberta currently produces about 4.3 million barrels of oil per day. Had the Northern Gateway, Keystone XL and Energy East pipelines been built, Alberta could now be producing and exporting an additional 2.5 million barrels of oil per day. The original Northern Gateway Pipeline — killed outright by the Justin Trudeau government — would have terminated in Kitimat. Smith is now talking about a pipeline that would terminate in Prince Rupert. This may obviate some of the concerns that Kitimat posed with oil tankers negotiating Douglas Channel, and their potential impacts on the marine environment.

One of the biggest hurdles to a pipeline to Prince Rupert may be B.C. Premier David Eby. The B.C. NDP government has a history of opposing oil pipelines with tooth and nail. Asked in a fireside chat by Peter Mansbridge how she would get around the B.C. problem, Smith confidently said: “I’ll convince David Eby.”

“I’m sensitive to the issues that were raised before,” she added. One of those concerns was emissions. But the Alberta government and oil industry has struck a grand bargain with Ottawa: pipelines for emissions abatement through carbon capture and storage.

The industry and government propose multi-billion investments in CCUS. The Pathways Alliance project alone represents an investment of $10 to $20 billion. Smith noted that there is no economic value in pumping CO2 underground. It only becomes economically viable if the tradeoff is greater production and export capacity for Alberta oil. “If you couple it with a million-barrel-per-day pipeline, well that allows you $20 billion worth of revenue year after year,” she said. “All of a sudden a $20 billion cost to have to decarbonize, it looks a lot more attractive when you have a new source of revenue.” When asked about the Prince Rupert pipeline proposal, Eby has responded that there is currently no proponent, and that it is therefore a bridge to cross when there is actually a proposal. “I think what I’ve heard Premier Eby say is that there is no project and no proponent,” Smith said. “Well, that’s my job. There will be soon.  “We’re working very hard on being able to get industry players to realize this time may be different.” “We’re working on getting a proponent and route.”

At a number of sessions during the conference, Mansbridge has repeatedly asked speakers about the Alberta secession movement, and whether it might scare off investment capital. Alberta has been using the threat of secession as a threat if Ottawa does not address some of the province’s long-standing grievances. Smith said she hopes Carney takes it seriously. “I hope the prime minister doesn’t want to test it,” Smith said during a scrum with reporters. “I take it seriously. I have never seen separatist sentiment be as high as it is now. “I’ve also seen it dissipate when Ottawa addresses the concerns Alberta has.” She added that, if Carney wants a true nation-building project to fast-track, she can’t think of a better one than a new West Coast pipeline. “I can’t imagine that there will be another project on the national list that will generate as much revenue, as much GDP, as many high paying jobs as a bitumen pipeline to the coast.”

Continue Reading

Alberta

Albertans need clarity on prime minister’s incoherent energy policy

Published on

From the Fraser Institute

By Tegan Hill

The new government under Prime Minister Mark Carney recently delivered its throne speech, which set out the government’s priorities for the coming term. Unfortunately, on energy policy, Albertans are still waiting for clarity.

Prime Minister Carney’s position on energy policy has been confusing, to say the least. On the campaign trail, he promised to keep Trudeau’s arbitrary emissions cap for the oil and gas sector, and Bill C-69 (which opponents call the “no more pipelines act”). Then, two weeks ago, he said his government will “change things at the federal level that need to be changed in order for projects to move forward,” adding he may eventually scrap both the emissions cap and Bill C-69.

His recent cabinet appointments further muddied his government’s position. On one hand, he appointed Tim Hodgson as the new minister of Energy and Natural Resources. Hodgson has called energy “Canada’s superpower” and promised to support oil and pipelines, and fix the mistrust that’s been built up over the past decade between Alberta and Ottawa. His appointment gave hope to some that Carney may have a new approach to revitalize Canada’s oil and gas sector.

On the other hand, he appointed Julie Dabrusin as the new minister of Environment and Climate Change. Dabrusin was the parliamentary secretary to the two previous environment ministers (Jonathan Wilkinson and Steven Guilbeault) who opposed several pipeline developments and were instrumental in introducing the oil and gas emissions cap, among other measures designed to restrict traditional energy development.

To confuse matters further, Guilbeault, who remains in Carney’s cabinet albeit in a diminished role, dismissed the need for additional pipeline infrastructure less than 48 hours after Carney expressed conditional support for new pipelines.

The throne speech was an opportunity to finally provide clarity to Canadians—and specifically Albertans—about the future of Canada’s energy industry. During her first meeting with Prime Minister Carney, Premier Danielle Smith outlined Alberta’s demands, which include scrapping the emissions cap, Bill C-69 and Bill C-48, which bans most oil tankers loading or unloading anywhere on British Columbia’s north coast (Smith also wants Ottawa to support an oil pipeline to B.C.’s coast). But again, the throne speech provided no clarity on any of these items. Instead, it contained vague platitudes including promises to “identify and catalyse projects of national significance” and “enable Canada to become the world’s leading energy superpower in both clean and conventional energy.”

Until the Carney government provides a clear plan to address the roadblocks facing Canada’s energy industry, private investment will remain on the sidelines, or worse, flow to other countries. Put simply, time is up. Albertans—and Canadians—need clarity. No more flip flopping and no more platitudes.

Tegan Hill

Tegan Hill

Director, Alberta Policy, Fraser Institute
Continue Reading

Trending

X