Connect with us

Business

Taxpayers Federation presents Teddy Waste Awards for worst government waste

Published

3 minute read

 

The Canadian Taxpayers Federation presented Teddy Waste Awards to Prime Minister Justin Trudeau for a decade of federal waste, Global Affairs Canada for spending $51,000 per month on booze and the city of Calgary for spending $65,000 so people can phone a river.

“Trudeau added 99,000 extra bureaucrats, billed taxpayers $6,000 per night for a hotel suite in England and spent six-figures on airplane food after the government promised to cut those costs,” said Franco Terrazzano, CTF Federal Director. “Bureaucrats at Global Affairs Canada are winning a Teddy Award because they are wasting money on booze faster than taxpayers can say bottoms up.”

The Teddy Waste Award, the golden pig-shaped trophy the CTF annually awards to governments’ worst waste offenders, is named after Ted Weatherill, a former federal appointee who was fired in 1999 for submitting a raft of dubious expense claims, including a $700 lunch for two in France.

The CTF’s big pink pig mascot, Porky the Waste Hater, was on hand at the ceremony, dressed in a tuxedo.

“New Brunswick spent tens of thousands of dollars to get Europeans to visit the province, but the tourism ads were full of errors because the writers clearly didn’t know much about New Brunswick,” Terrazzano said.

“The city of Calgary won a Teddy Waste Award for spending $65,000 so people can telephone the Bow River and hear what wasting tax dollars sounds like.”

This year’s winners include:

  • Municipal Teddy Winner: The city of Calgary

In most cities, you can only send a message in a bottle down a river. But not in Calgary, where the city spent $65,000 so people can phone the Bow River.

  • Provincial Teddy Winner: New Brunswick

New Brunswick spent $77,000 on an eight-day trip to Europe to get Europeans to visit the province. The ads created to promote New Brunswick to Europeans were full of gaffs and incorrect information about the province.

  • Federal Teddy Winner: Global Affairs Canada

The federal department of Global Affairs Canada spends an average of $51,000 per month on booze, according to records obtained by the CTF. Perhaps all that alcohol explains the department’s crazy spending, like an $8,800 sex toy show in Germany and a $1,700 musical featuring lesbian pirates?

  • Lifetime Achievement Teddy Waste Award Winner: Former prime minister Justin Trudeau

On his way to doubling the federal debt in less than a decade, Trudeau added 99,000 federal bureaucrats and wasted taxpayers’ money all over the world on fancy feasts and hotel suites.

You can find the backgrounder on this year’s Teddy Waste Award nominees and winners HERE.

Todayville is a digital media and technology company. We profile unique stories and events in our community. Register and promote your community event for free.

Follow Author

Alberta

Canadian Oil Sands Production Expected to Reach All-time Highs this Year Despite Lower Oil Prices

Published on

From Energy Now

S&P Global Commodity Insights has raised its 10-year production outlook for the Canadian oil sands. The latest forecast expects oil sands production to reach a record annual average production of 3.5 million b/d in 2025 (5% higher than 2024) and exceed 3.9 million b/d by 2030—half a million barrels per day higher than 2024. The 2030 projection is 100,000 barrels per day (or nearly 3%) higher than the previous outlook.

The new forecast, produced by the S&P Global Commodity Insights Oil Sands Dialogue, is the fourth consecutive upward revision to the annual outlook. Despite a lower oil price environment, the analysis attributes the increased projection to favorable economics, as producers continue to focus on maximizing existing assets through investments in optimization and efficiency.


Get the Latest Canadian Focused Energy News Delivered to You! It’s FREE: Quick Sign-Up Here


While large up-front, out-of-pocket expenditures over multiple years are required to bring online new oil sands projects, once completed, projects enjoy relatively low breakeven prices.

S&P Global Commodity Insights estimates that the 2025 half-cycle break-even for oil sands production ranged from US$18/b to US$45/b, on a WTI basis, with the overall average break-even being approximately US$27/b.*

“The increased trajectory for Canadian oil sands production growth amidst a period of oil price volatility reflects producers’ continued emphasis on optimization—and the favorable economics that underpin such operations,” said Kevin Birn, Chief Canadian Oil Analyst, S&P Global Commodity Insights. “More than 3.8 million barrels per day of existing installed capacity was brought online from 2001 and 2017. This large resource base provides ample room for producers to find debottlenecking opportunities, decrease downtime and increase throughput.”

The potential for additional upside exists given the nature of optimization projects, which often result from learning by doing or emerge organically, the analysis says.

“Many companies are likely to proceed with optimizations even in more challenging price environments because they often contribute to efficiency gains,” said Celina Hwang, Director, Crude Oil Markets, S&P Global Commodity Insights. “This dynamic adds to the resiliency of oil sands production and its ability to grow through periods of price volatility.”

The outlook continues to expect oil sands production to enter a plateau later this decade. However, this is also expected to occur at a higher level of production than previously estimated. The new forecast expects oil sands production to be 3.7 million b/d in 2035—100,000 b/d higher than the previous outlook.

Export capacity—already a concern in recent years—is a source of downside risk now that even more production growth is expected. Without further incremental pipeline capacity, export constraints have the potential to re-emerge as early as next year, the analysis says.

“While a lower price path in 2025 and the potential for pipeline export constraints are downside risks to this outlook, the oil sands have proven able to withstand extreme price volatility in the past,” said Hwang. “The low break-even costs for existing projects and producers’ ability to manage challenging situations in the past support the resilience of this outlook.”

* Half-cycle breakeven cost includes operating cost, the cost to purchase diluent (if needed), as well as an adjustment to enable a comparison to WTI—specifically, the cost of transport to Cushing, OK and quality differential between heavy and light oil.

About S&P Global Commodity Insights

At S&P Global Commodity Insights, our complete view of global energy and commodity markets enables our customers to make decisions with conviction and create long-term, sustainable value.

We’re a trusted connector that brings together thought leaders, market participants, governments, and regulators and we create solutions that lead to progress. Vital to navigating commodity markets, our coverage includes oil and gas, power, chemicals, metals, agriculture, shipping and energy transition. Platts® products and services, including leading benchmark price assessments in the physical commodity markets, are offered through S&P Global Commodity Insights. S&P Global Commodity Insights maintains clear structural and operational separation between its price assessment activities and the other activities carried out by S&P Global Commodity Insights and the other business divisions of S&P Global.

S&P Global Commodity Insights is a division of S&P Global (NYSE: SPGI). S&P Global is the world’s foremost provider of credit ratings, benchmarks, analytics and workflow solutions in the global capital, commodity and automotive markets. With every one of our offerings, we help many of the world’s leading organizations navigate the economic landscape so they can plan for tomorrow, today. For more information visit https://www.spglobal.com/commodity-insights/en.

SOURCE S&P Global Commodity Insights

Continue Reading

Business

Federal government should finally cut Trudeau-era red tape

Published on

From the Fraser Institute

By Kenneth P. Green

If Prime Minister Carney really wants to show he’s committed to “Building Canada” he’d ceremoniously defenestrate Bill C-48, scap the cap on Canadian Oil and Gas related greehhouse gas emissions, and ax the so-called Clean Electricity Regulations

As pretty much everyone knows, Canada has a building problem. Whether it’s provincial building of housing or infrastructure, or national building of highways, pipelines or energy production facilities, Canada can seemingly not get things built no matter how many companies and investors propose projects (or how many newspaper opinion columns or public opinion polls shows that people want things built).

The Carney government appears to recognize this problem and recently introduced Bill C-5. Of course, appearances can be deceiving. Superficially, a lot of what’s in the proposed bill sounds good: facilitating free trade and labour mobility inter-provincially, and ostensibly streamlining government’s regulatory powers to facilitate the timely building of projects deemed to be in Canada’s national interests. Who could be against that?

Per the government, the “Bill seeks to get projects in the national interest built by focusing on a small number of executable projects and shifting the focus of federal reviews from ‘whether’ to build these projects to ‘how’ to best advance them.” Again, looks great, but even a cursory reading by a legal layman reveals the fact that, in reality, little has changed in regard to the approval of major building projects in Canada. Just as it is now, under the new regime, the prime minister’s office (and designees elsewhere in government) ultimately have carte blanche in deciding whether or not projects of significance can be built in Canada, under what timeline, and based on whatever criteria they deem appropriate.

All that is better than nothing, of course, but words (particularly political words) are cheap and actions more valuable. If Prime Minister Carney really wants to show he’s committed to “Building Canada” he’d ceremoniously defenestrate Bill C-48 (a.k.a. the “Tanker Ban Bill”), which came into effect last year under the Trudeau government and changed tanker regulations off British Columbia’s northern coast, torpedoing any prospects of building oil export pipelines on Canada’s west coast.

He could also scrap the cap on Canadian oil and gas-related greenhouse gas emissions (introduced by the Trudeau government in 2024) and regulations (also introduced in 2024) for methane emissions in the oil and gas sector, both of which will almost inevitably raise costs and curtail production.

Finally, the prime minister could ax the so-called “Clean Electricity Regulations” that will likely drive electricity rates through the roof while ushering in an age of less-reliable electricity supply and less building of conventional energy-generation from natural gas, a fuel far more reliable than Canada’s fickle winds and often-tepid sunlight. By driving up energy costs across Canada and through the entire chain of production and service economies, these regulations (again, enacted by the Trudeau government) will make it more expensive to build anything anywhere in Canada.

Prime Minister Carney has made some nice noises seemingly recognizing that Canada has a building problem, particularly with regard to energy projects, and Bill C-5 makes equally nice (yet ill-defined) noises about regulatory reform in the energy and natural resource sectors. But Canada doesn’t have a shortage of nebulous government pronouncements; it has an overdose of regulatory restrictions preventing building in Canada. He should show real seriousness and eliminate the raft of Trudeau-era red tape stifling growth and development in Canada.

And sooner is better than later. Canada’s biggest economic competitors (not only the United States) are not sitting on their red-taped hands watching their economies decline.

Continue Reading

Trending

X