Connect with us

Alberta

“The River” water feature chosen by Albertans for the Legislature Grounds

Published

4 minute read

Albertans choose water feature at legislature grounds

Work is underway at the legislature grounds to restore the existing pools and install a new water feature.

Input from nearly 4,000 Albertans in a recent Government of Alberta survey has determined the design of a new water feature for the legislature grounds.

Albertans overwhelmingly supported the design concept “River,” which received more than 65 per cent of the vote.

Here is the announcement from Deputy Premier Nathan Neudorf and Speaker Nathan Cooper:

The survey ran Jan. 12-27 and gave Albertans the chance to choose their favourite of three proposed designs for a new water feature that will be installed at the north plaza of the legislature grounds, replacing the deteriorated terraced wading pools.

Of the other two designs, “Aurora” received 17.1 per cent of the votes followed closely by “Strata” with 17 per cent.

“Thank you to everyone who helped us choose the River design. Nearly 4,000 Albertans responded to the project survey. The feedback and suggestions provided have been crucial in determining the look, feel and future use of this part of our legislature grounds. Your input helps ensure that Alberta’s legislature and grounds will continue to be a destination for Albertans and visitors alike.”

Nathan Neudorf, Minister of Infrastructure

“Alberta’s legislature and grounds are a gathering place for Albertans and visitors from all walks of life. Thanks to this project, the north plaza will have a great new gathering place to enjoy in the summer months. Thank you so much to everyone who took time to submit their feedback. I cannot wait until the new features open in 2024!”

Nathan Cooper, Speaker, Legislative Assembly of Alberta

Removing the terraced wading pools and installing the new River area will be part of a larger project to refurbish the water features and improve the north plaza.

Project work at the north plaza is underway and is expected to be completed in 2024.

Quick facts

  • The dome fountain and reflecting and wading pools have been closed to the public since 2020 due to the COVID-19 pandemic and mechanical system and public safety issues.
  • $20 million is being invested into renewing or replacing the water features and walkways on the Alberta legislature grounds:
    • $10 million through the Alberta government’s Budget 2022 Capital Plan
    • $10 million through the Investing in Canada Infrastructure Program (ICIP), with $8 million from the Government of Canada and $2 million from the Alberta government
  • The Jan. 12- 27 survey posted to alberta.ca received 3,663 responses to the question: Do you have a preferred North Plaza design concept?
    • River – 2,413 votes
    • Aurora – 628 votes
    • Strata – 622 votes
  • Reasons Albertans chose the River concept include:
    • tranquility
    • natural materials
    • use of planting/landscape for colour
    • more green space, less concrete
    • shade provided by trees
    • continuous flowing water
    • maintained site lines of legislature building
    • accessible water animation
  • Repairs will be made to the reflecting pool and ornamental dome fountain, replacing piping, updating mechanical and filtration systems, and fixing leaks. The cracked and weathered concrete decking and walkways around all the water features will be replaced. The water barrier on top of the 97 Avenue underpass will also be replaced with a new membrane.

 

This is a news release from the Government of Alberta.

Follow Author

Alberta

Meet Marjorie Mallare, a young woman with a leading role at one of Canada’s largest refineries

Published on

Marjorie Mallare at Imperial Oil’s Strathcona refinery. 

Fr0m the Canadian Energy Centre

By Cody Ciona

Mallare manages an all-female team of engineers helping keep operations smooth and safe

As the utilities and hydroprocessing technical lead for Imperial Oil’s Strathcona Refinery near Edmonton, 32-year-old Marjorie Mallare and her team help ensure operations run smoothly and safely at one of Canada’s largest industrial facilities.

The exciting part, she says, is that all four engineers she leads are female.

It’s part of the reason Mallare was named one of ten Young Women in Energy award winners for 2025.

“I hope they realize how important the work that they do is, inspiring and empowering women, connecting women and recognizing women in our industry,” she says.

“That can be very pivotal for young women, or really any young professional that is starting off their career.”

Born and raised in the Philippines, Mallare and her family moved to Edmonton near the end of junior high school.

Living in the industrial heartland of Alberta, it was hard not to see the opportunity present in the oil and gas industry.

When she started post-secondary studies at the University of Alberta in the early 2010s, the industry was booming.

“The amount of opportunities, at least when I started university, which was around 2011, was one of the high periods in our industry at the time. So, it was definitely very attractive,” Mallare says.

When choosing a discipline, engineering stood out.

“At the time, chemical engineering had the most number of females, so that was a contributing factor,” she says.

“Just looking at what’s available within the province, within the city, chemical engineering just seemed to offer a lot more opportunities, a lot more companies that I could potentially work for.”

Through work co-ops in oil and gas, her interest in a career in the industry continued to grow.

“It just kind of naturally happened. That drew my interest more and more, and it made it easier to find future opportunities,” Mallare says.

Following a work practicum with Imperial Oil and graduation, she started working with the company full time.

On the side, Mallare has also driven STEM outreach programs, encouraging young women to pursue careers in engineering.

In addition to supporting the Strathcona Refinery’s operations department, Mallare and her team work on sustainability-focused projects and reducing the refinery’s carbon footprint.

The 200,000 barrel per day facility represents about 30 per cent of Western Canada’s refining capacity.

“Eventually, our group will also be responsible for running the new renewable diesel unit that we’re planning to commission later this year,” says Mallare.

Once completed, the $720 million project will be the largest renewable diesel facility in Canada, producing more than one billion litres of biofuel annually.

Projects like these are why Mallare believes Canada will continue to be a global energy leader.

“We’re leading others already with regards to pursuing more sustainable alternatives and reducing our carbon footprints overall. That’s not something we should lose sight of.”

Continue Reading

Alberta

Alberta Precipitation Update

Published on

Below are my updated charts through April 2025 along with the cumulative data starting in October 2024. As you can see, central and southern Alberta are trending quite dry, while the north appears to be faring much better. However, even there, the devil is in the details. For instance, in Grande Prairie the overall precipitation level appears to be “normal”, yet in April it was bone dry and talking with someone who was recently there, they described it as a dust bowl. In short, some rainfall would be helpful. These next 3 months are fairly critical.

 

 

Thanks for reading William’s Substack!

Subscribe for free to receive new posts and support my work.

Continue Reading

Trending

X