Connect with us

Alberta

Play Hard, Fight Hard at the Alberta Sports Hall of Fame

Published

4 minute read

THE HALFTIME REPORT
News from the Alberta Sports Hall of Fame

Time is Running Out to see the Play Hard, Fight Hard Exhibit

The Play Hard, Fight Hard: Sport and the Canadian Military exhibit has been on loan to us since November. It was created through a partnership between The Military Museums in Calgary and Canada’s Sports Hall of Fame, Play Hard, Fight Hard: Sport and the Canadian Military explores the relationship between sports and military service. This is a bilingual pop-up travelling exhibit, representing fourteen sports played by military teams and athletes from the 1880s to the present day. It features sections on the Soldier On program, origins of the Paralympic Games, Invictus Games, and 20 videos containing oral histories and Second World War newsreel footage.

This exhibit highlights Alberta Sports Hall of Fame Honoured Members Paul Rowe, Doc Seaman, Alex Decoteau, and Dr. Robert Steadward.

It is currently set up in our Hall of Fame Gallery. See it before it leaves this spring.

Exhibit Highlight: Dr. Willie Littlechild

We have on display this traditional ceremonial Chiefs outfit that was worn by Chief Dan Minde of the Ermineskin Tribe of the Maskwacis Cree Nation. It is on loan to us by his grandson, Honoured Member Dr. Willie Littlechild.

The medal was won by Willie at the World Indigenous Games in Brazil in 2015. It is made of wood from the Amazon Rainforest and contains a drop of water at the centre from the purest water source in the world.

Dr. Willie Littlechild was inducted in 2009 as a Multisport Builder. You can learn more about him by following the link to his profile.

Honoured Member Profile

This newsletter is sponsored by G-Force Signs & Graphics.

 Honoured Member Highlight – Doug Hansen

Luge Athlete/Builder – Inducted in 1991

Doug Hansen began his luge career in Europe in 1970 as there were no luge tracks in North America.  He was a member of the Canadian National Luge Team competing at the 1971 World Championships and the 1972 and 1976 Winter Olympics.  The doubles start was revolutionized by his invention of the “doubles start strap.”

Honoured Member Profile

Provincial Sport Organization: Alberta Luge Association

The Alberta Luge Association (“ALA”)  has operated as a non-profit provincial sports association promoting the development of Luge training and competition in the province of Alberta. Their mission is to ensure the successful growth of the sport in Alberta through developing athletes, coaches, and volunteers at the recreational and elite levels.

Artifact in Focus!

Luge Championship Plaque.

Grey slate plaque with a black engraved logo that reads “29th Luge World Championships.”

Your Donation Helps

The Alberta Sports Hall of Fame needs your support to continue the ongoing preservation of Alberta’s sports history and the development of museum exhibits. We are grateful and appreciative of the generosity of our supporters and friends. We would be happy to assist you in choosing how your personal legacy will be fulfilled and the many options available. Here is some information on donating shares to ASHFM and the benefits to you as a donor.

Donate

The Alberta Sports Hall of Fame provides a family-friendly, interactive experience. You will be surprised by what you discover inside! Have fun, laugh, play and discover Alberta sports heroes together. The Alberta Sports Hall of Fame is an interactive, hands-on celebration of Alberta's sporting history. Our over 7,000 square feet of exhibit space includes a multisport area with virtual baseball, basketball, football, hockey, and soccer; an adaptive sports area, including a 200 meter wheelchair challenge; a Treadwall climbing wall; the Orest Korbutt Theatre; the Hall of Fame Gallery; an art gallery displaying works by provincial artists, and much more. Our venue boasts a collection of over 17,000 artefacts of Alberta sports history and showcases many of these items in a number of displays. The Alberta Sports Hall of Fame also offers an education program, group activities, and a unique environment to rent for your birthday party, special event, corporate reception or meetings.

Follow Author

Alberta

Alberta health care blockbuster: Province eliminating AHS Health Zones in favour of local decision-making!

Published on

Hospital Based Leadership: Eliminating the bureaucratic vortex in hospitals

Since Alberta’s government announced plans to refocus the health care system in November 2023, a consistent message has emerged from patients, front-line health care workers and concerned Albertans alike about the flaws of the prior system. Alberta Health Services’ current zone-based leadership structure is overly complex and bureaucratic. It lacks the flexibility and responsiveness needed to effectively support facilities and staff – particularly when it comes to hiring, securing supplies and adopting necessary technologies.

That’s why Alberta’s government is changing to a hospital-based leadership structure. On-site leadership teams will be responsible for hiring staff, managing resources and solving problems to effectively serve their patients and communities. Hospitals will now have the flexibility to respond, freedom to adapt and authority to act, so they can meet the needs of their facilities, patients and workforce in real time.

“What works in Calgary or Edmonton isn’t always what works in Camrose or Peace River. That’s why we’re cutting through bureaucracy and putting real decision-making power back in the hands of local hospital leaders, so they can act fast, hire who they need and deliver better care for their communities.”

Danielle Smith, Premier

“Hospital-based leadership ensures decisions on hiring, supplies and services are made efficiently by those closest to care – strengthening acute care, supporting staff and helping patients get the timely, high-quality care they need and deserve.”

Matt Jones, Minister of Hospital and Surgical Health Services

“By rethinking how decisions are made, we’re working to improve health care through a more balanced and practical approach. By removing delays and empowering our on-site leaders, we’re giving facilities the tools to respond to real-time needs and ultimately provide better care to Albertans.”

Adriana LaGrange, Minister of Primary and Preventative Health Services

AHS’ health zones will be eliminated, and acute care sites will be integrated into the seven regional corridors. These sites will operate under a new leadership model that emphasizes site-level performance management. Clear expectations will be set by Acute Care Alberta, and site operations will be managed by AHS through a hospital-based management framework. All acute care sites will be required to report to Acute Care Alberta based on these defined performance standards.

“Standing up Acute Care Alberta has allowed AHS to shift its focus to hospital-based services. This change will enable the local leadership teams at those hospitals to make site-based decisions in real and tangible ways that are best for their patients, families and staff. Acute Care Alberta will provide oversight and monitor site-level performance, and I’m confident overall hospital performance will improve when hospital leadership and staff have more authority to do what they know is best.”

Dr. Chris Eagle, interim CEO, Acute Care Alberta

“AHS is focused on reducing wait times and improving care for patients. By shifting to hospital-based leadership, we’re empowering hospital leaders to make real-time decisions based on what’s happening on the ground and respond to patient needs as they arise. It also means leaders can address issues we know have been frustrating, like hiring staff where they’re needed most and advancing hospital operations. This change enables front-line teams to act on ideas they see every day to improve care.”

Andre Tremblay, interim president & CEO, Alberta Health Services

The Ministry of Hospital and Surgical Health Services, Acute Care Alberta and Alberta Health Services will work collaboratively to design and establish the new leadership and management model with an interim model to be established by November 2025, followed by full implementation by summer 2026.

Quick facts

  • Countries like the Netherlands and Norway, and parts of Australia have already made the shift to hospital-based leadership.
  • The interim hospital-based leadership model will be implemented at one site before being implemented provincewide.
  • Hospital-based leadership, once implemented, will apply only to AHS acute care facilities. Other acute care organizations will not be affected at the time of implementation.

Related information

Continue Reading

Alberta

Alberta is investing up to $50 million into new technologies to help reduce oil sands mine water

Published on

Technology transforming tailings ponds

Alberta’s oil sands produce some of the most responsible energy in the world and have drastically reduced the amount of fresh water used per barrel. Yet, for decades, operators have been forced to store most of the water they use on site, leading to billions of litres now contained largely in tailings ponds.

Alberta is investing $50 million from the industry-funded TIER system to help develop new and improved technologies that make cleaning up oil sands mine water safer and more effective. Led by Emissions Reduction Alberta, the new Tailings Technology Challenge will help speed up work to safely reclaim the water in oil sands tailing ponds and eventually return the land for use by future generations.

“Alberta’s government is taking action by funding technologies that make treating oil sands water faster, effective and affordable. We look forward to seeing the innovative solutions that come out of this funding challenge, and once again demonstrate Alberta’s global reputation for sustainable energy development and environmental stewardship.”

Rebecca Schulz, Minister of Environment and Protected Areas

“Tailings and mine water management remain among the most significant challenges facing Alberta’s energy sector. Through this challenge, we’re demonstrating our commitment to funding solutions that make water treatment and tailings remediation more affordable, scalable and effective.”

Justin Riemer, CEO, Emissions Reduction Alberta

As in other mines, the oil sands processing creates leftover water called tailings that need to be properly managed. Recently, Alberta’s Oil Sands Mine Water Steering Committee brought together industry, academics and Indigenous leaders to identify the best path forward to safely address mine water and reclaim land.

This new funding competition will support both new and improved technologies to help oil sands companies minimize freshwater use, promote responsible ways to manage mine water and reclaim mine sites. Using technology for better on-site treatment will help improve safety, reduce future clean up costs and environmental risks, and speed up the process of safely addressing mine water and restoring sites so they are ready for future use.

“Innovation has always played an instrumental role in the oil sands and continues to be an area of focus. Oil sands companies are collaborating and investing to advance environmental technologies, including many focused on mine water and tailings management. We’re excited to see this initiative, as announced today, seeking to explore technology development in an area that’s important to all Albertans.”

Kendall Dilling, president, Pathways Alliance 

Quick facts

  • All mines produce tailings. In the oil sands, tailings describe a mixture of water, sand, clay and residual bitumen that are the byproduct of the oil extraction process.
  • From 2013 to 2023, oil sands mine operations reduced the amount of fresh water used per barrel by 28 per cent. Recycled water use increased by 51 per cent over that same period.
  • The Tailings Technology Challenge is open to oil sands operators and technology providers until Sept. 24.
  • The Tailings Technology Challenge will invest in scale-up, pilot, demonstration and first-of-kind commercial technologies and solutions to reduce and manage fluid tailings and the treatment of oil sands mine water.
  • Eligible technologies include both engineered and natural solutions that treat tailings to improve water quality and mine process water.
  • Successful applicants can receive up to $15 million per project, with a minimum funding request of $1 million.
  • Oil sands operators are responsible for site management and reclamation, while ongoing research continues to inform and refine best practices to support effective policy and regulatory outcomes.

Related information

Continue Reading

Trending

X