Connect with us
[the_ad id="89560"]

Red Deer

Today only! Entry deadline & sneak a peek at the dream home!

Published

1 minute read

Tonight!  That’s when we’re cutting off entries for our Previous Supporter cash prize draws.  Right now, you still have a chance to win in 5 draws for $1,000 each.  Buy your tickets before 11:59pm for your chance in the previous supporter draws, and don’t forget you’ll also be entered in our $20,000 Early Bird and $10,000 Second Chance Early Bird!
PREVIOUS SUPPORTER DRAWS: 5 PRIZES OF $1000 CASH!

CHECK OUT OUR GREAT TICKET PACKAGES

1 for $25  5 for $100  10 for $125  25 for $250

BUY NOW!

Sneak-a-Peek at our Sorento Custom Dream Home

TONIGHT!  6PM – 8PM |

16 Emmett Crescent, Red Deer

MEGA BUCKS 50 IS BACK!
Win half of an increasing jackpot of up to $1,000,000

DON’T FORGET!

$10 EACH | 10 FOR $25
25 FOR $50 | 50 FOR $75

GET YOUR TICKETS!
Thank you so much for your support, and best of luck in the draws. 
CALL RED DEER & AREA OR TOLL FREE
403.340.1878      1.877.808.9005

Alberta

Hells Angels member arrested with handgun in Red Deer

Published on

 A member of the Hells Angels Alberta Nomads chapter is facing charges after being found in possession of a handgun.

Owen Czech was arrested by ALERT’s Integrated Gang Enforcement Team on November 13, 2024 in Red Deer. The 55-year-old outlaw biker was found in possession of a Glock handgun, along with multiple magazines.

“Despite their best efforts to portray themselves as nothing more than motorcycle enthusiasts, the Hells Angels routinely find themselves involved in criminal activity and are a threatening presence in our communities,” said Insp. Angela Kemp, ALERT.

ALERT interrupted Czech and two other members of the Syndicate Motorcycle Club, a support club to the Hells Angels, as they were allegedly committing an assault. Czech allegedly attempted to conceal the firearm in a vehicle when stopped by police.

Czech is a self-identified member of the Hells Angels and was bound by conditions not to possess firearms.

Czech has been charged with:

  • Assault;
  • Possession of a weapon for a dangerous purpose;
  • Unauthorized possession of a firearm;
  • Careless use of a firearm;
  • Unauthorized possession of a firearm in a vehicle;
  • Possession of a prohibited firearm knowing its possession is unauthorized;
  • Carrying a concealed weapon; and
  • Failing to comply with a release order.
Czech remains in custody and is scheduled to speak to bail on November 27, 2024.

ALERT’s Integrated Gang Enforcement Team is a uniform team focused on violence suppression and combatting gang activity throughout the province.

Members of the public who suspect drug or gang activity in their community can call local police, or contact Crime Stoppers at 1-800-222-TIPS (8477). Crime Stoppers is always anonymous.

ALERT was established and is funded by the Alberta Government and is a compilation of the province’s most sophisticated law enforcement resources committed to tackling serious and organized crime.

Continue Reading

Alberta

Province considering new Red Deer River reservoir east of Red Deer

Published on

Central Alberta reservoir study underway

Alberta’s government is moving forward a study to assess the feasibility of building a new reservoir on the Red Deer River to help support growing communities.

Demand for water from communities and businesses is increasing as more families, businesses and industries choose to live and work in central Alberta. The Red Deer River supplies water to hundreds of thousands of Albertans across the region and expanding water storage capacity could help reduce the risk of future droughts and meet the growing water demands.

Alberta’s government has now begun assessing the feasibility of building a potential new reservoir east of Red Deer near Ardley. A two-phase, multi-year study will explore the costs and value of constructing and operating the reservoir, and its impact on downstream communities, farmers and ranchers, and businesses.

“Central Alberta is a growing and thriving, and we are ensuring that it has the water it needs. This study will help us determine if an Ardley reservoir is effective and how it can be built and operated successfully to help us manage and maximize water storage for years to come.”

Rebecca Schulz, Minister of Environment and Protected Areas

Reservoirs play a vital role in irrigation, drought management, water security and flood protection. Budget 2024 allocated $4.5 million to explore creating a new reservoir on the Red Deer River, at a damsite about 40 kilometres east of the City of Red Deer.

Work will begin on the scoping phase of the study as soon as possible. This will include reviewing available geotechnical and hydrotechnical information and exploring conceptual dam options. The scoping phase also includes meetings with municipalities and water users in the area to hear their views. This work is expected to be completed by December 2025.

“Reliable water infrastructure is essential for Alberta’s growing communities and industries. The Ardley reservoir feasibility study is a vital step toward ensuring long-term water security for central Alberta. As we assess this project’s potential, we’re supporting the sustainability of our economic corridors, agricultural operations and rural economy.”

Devin Dreeshen, Minister of Transportation and Economic Corridors

“Water is essential to the agriculture industry and if the past few years are any indication, we need to prepare for dry conditions. A potential dam near Ardley could enhance water security and help farmers and ranchers continue to thrive in Alberta’s unpredictable conditions.”

RJ Sigurdson, Minister of Agriculture and Irrigation 

Once that is complete, the feasibility study will then shift into a second phase, looking more closely at whether an effective new dam near Ardley can be safely designed and constructed, and the impact it may have on communities and the environment. Geotechnical and hydrotechnical investigations, cost-benefit analyses and an assessment of environmental and regulatory requirements will occur. The feasibility phase will also include gathering feedback directly from Albertans through public engagement. This work is expected to be completed by March 31, 2026.

Quick facts

  • The Ardley dam scoping and feasibility study will be undertaken by Hatch Ltd., a Canadian multi-disciplinary professional services firm.
  • Once the feasibility study is complete, government will assess the results and determine whether to pursue this project and proceed with detailed engineering and design work and regulatory approvals.
  • Alberta’s government owns and operates several large reservoirs in the South Saskatchewan River Basin that help ensure sufficient water supply to meet demand from communities, irrigators and businesses, while also maintaining a healthy aquatic environment.
  • Water stored at Gleniffer Lake, the reservoir created by Dickson Dam, helps supplement low winter flows along the Red Deer River and helps ensure an adequate water supply for Red Deer and Drumheller.

Related information

Continue Reading

Trending

X