Connect with us
[bsa_pro_ad_space id=12]

Alberta

Alberta workers now eligible for unpaid job-protected leave – Alberta COVID-19 update (April 6)

Published

4 minute read

Dr. Deena Hinshaw

From the Province of Alberta

Supporting Albertans during COVID-19

 

This is an extremely difficult time for all Albertans and temporary rules will be in place to provide job protection for workers and flexibility for employers during this pandemic.

Following direction and recommendations provided by the chief medical officer of health, employers have had to adjust operations significantly. The Government of Alberta is taking immediate action to allow employers to appropriately respond to public health measures and at the same time allow employees to remain attached to jobs and have the ability to access federal assistance programs.

“The health and safety of Albertans continues to be our top priority. The Government of Alberta is doing everything it can to help contain the spread of COVID-19. Changes to the Employment Standards Code will ensure Albertans can care for themselves and their loved ones during these challenging times, while providing flexibility to Alberta’s job creators.”

Jason Copping, Minister of Labour and Immigration

“Our industry has been one of the hardest hit so far by COVID-19, with nearly two-thirds of our workforce now lost. These changes to Alberta’s Employment Standards Code will help food service businesses adapt as needed to the evolving public health situation so that they can remain operational during this extraordinarily difficult time. As Alberta’s third largest private sector employer, the 150,000 workers typically working in our industry depend on the ability of restaurants to be able to survive and recover from this crisis. These changes will build on our efforts to safeguard public health and ensure business continuity as much as possible. They will help provide the relief our job creators need to reopen and rehire once we get through this crisis.”

Mark von Schellwitz, vice-president, Western Canada – Restaurants Canada

Changes for employees

  • Employees caring for children affected by school and daycare closures or ill or self-isolated family members due to COVID-19 will have access to unpaid job-protected leave. The 90-day employment requirement is waived and leave length is flexible.

Changes for employees and employers

  • Increasing the maximum time for a temporary layoff from 60 days to 120 days to ensure temporarily laid off employees stay attached to a job longer. This change is retroactive for any temporary layoffs related to COVID-19 that occurred on or after March 17.

Changes for employers

  • Improving scheduling flexibility by removing the 24-hour written notice requirement for shift changes, and the two weeks’ notice for changes to work schedules for those under an averaging agreement.
  • Removing the requirement to provide the group termination notice to employees and unions when 50 or more employees are being terminated.
  • Streamlining the process for approvals related to modifying employment standards so employers and workers can respond quicker to changing conditions at the workplace due to the public health emergency.

Duration

The changes above take effect immediately and will be in place as long as government determines it is needed and the public health emergency order remains.

Alberta has a comprehensive response to COVID-19 including measures to enhance social distancing, screening and testing. Financial supports are helping Alberta families and businesses.

Red Deer College exercising an “abundance of caution” after person in college community tests positive for COVID-19

After 15 years as a TV reporter with Global and CBC and as news director of RDTV in Red Deer, Duane set out on his own 2008 as a visual storyteller. During this period, he became fascinated with a burgeoning online world and how it could better serve local communities. This fascination led to Todayville, launched in 2016.

Follow Author

Alberta

Alberta’s grand bargain with Canada includes a new pipeline to Prince Rupert

Published on

From Resource Now

By

Alberta renews call for West Coast oil pipeline amid shifting federal, geopolitical dynamics.

Just six months ago, talk of resurrecting some version of the Northern Gateway pipeline would have been unthinkable. But with the election of Donald Trump in the U.S. and Mark Carney in Canada, it’s now thinkable.

In fact, Alberta Premier Danielle Smith seems to be making Northern Gateway 2.0 a top priority and a condition for Alberta staying within the Canadian confederation and supporting Mark Carney’s vision of making Canada an Energy superpower. Thanks to Donald Trump threatening Canadian sovereignty and its economy, there has been a noticeable zeitgeist shift in Canada. There is growing support for the idea of leveraging Canada’s natural resources and diversifying export markets to make it less vulnerable to an unpredictable southern neighbour.

“I think the world has changed dramatically since Donald Trump got elected in November,” Smith said at a keynote address Wednesday at the Global Energy Show Canada in Calgary. “I think that’s changed the national conversation.” Smith said she has been encouraged by the tack Carney has taken since being elected Prime Minister, and hopes to see real action from Ottawa in the coming months to address what Smith said is serious encumbrances to Alberta’s oil sector, including Bill C-69, an oil and gas emissions cap and a West Coast tanker oil ban. “I’m going to give him some time to work with us and I’m going to be optimistic,” Smith said. Removing the West Coast moratorium on oil tankers would be the first step needed to building a new oil pipeline line from Alberta to Prince Rupert. “We cannot build a pipeline to the west coast if there is a tanker ban,” Smith said. The next step would be getting First Nations on board. “Indigenous peoples have been shut out of the energy economy for generations, and we are now putting them at the heart of it,” Smith said.

Alberta currently produces about 4.3 million barrels of oil per day. Had the Northern Gateway, Keystone XL and Energy East pipelines been built, Alberta could now be producing and exporting an additional 2.5 million barrels of oil per day. The original Northern Gateway Pipeline — killed outright by the Justin Trudeau government — would have terminated in Kitimat. Smith is now talking about a pipeline that would terminate in Prince Rupert. This may obviate some of the concerns that Kitimat posed with oil tankers negotiating Douglas Channel, and their potential impacts on the marine environment.

One of the biggest hurdles to a pipeline to Prince Rupert may be B.C. Premier David Eby. The B.C. NDP government has a history of opposing oil pipelines with tooth and nail. Asked in a fireside chat by Peter Mansbridge how she would get around the B.C. problem, Smith confidently said: “I’ll convince David Eby.”

“I’m sensitive to the issues that were raised before,” she added. One of those concerns was emissions. But the Alberta government and oil industry has struck a grand bargain with Ottawa: pipelines for emissions abatement through carbon capture and storage.

The industry and government propose multi-billion investments in CCUS. The Pathways Alliance project alone represents an investment of $10 to $20 billion. Smith noted that there is no economic value in pumping CO2 underground. It only becomes economically viable if the tradeoff is greater production and export capacity for Alberta oil. “If you couple it with a million-barrel-per-day pipeline, well that allows you $20 billion worth of revenue year after year,” she said. “All of a sudden a $20 billion cost to have to decarbonize, it looks a lot more attractive when you have a new source of revenue.” When asked about the Prince Rupert pipeline proposal, Eby has responded that there is currently no proponent, and that it is therefore a bridge to cross when there is actually a proposal. “I think what I’ve heard Premier Eby say is that there is no project and no proponent,” Smith said. “Well, that’s my job. There will be soon.  “We’re working very hard on being able to get industry players to realize this time may be different.” “We’re working on getting a proponent and route.”

At a number of sessions during the conference, Mansbridge has repeatedly asked speakers about the Alberta secession movement, and whether it might scare off investment capital. Alberta has been using the threat of secession as a threat if Ottawa does not address some of the province’s long-standing grievances. Smith said she hopes Carney takes it seriously. “I hope the prime minister doesn’t want to test it,” Smith said during a scrum with reporters. “I take it seriously. I have never seen separatist sentiment be as high as it is now. “I’ve also seen it dissipate when Ottawa addresses the concerns Alberta has.” She added that, if Carney wants a true nation-building project to fast-track, she can’t think of a better one than a new West Coast pipeline. “I can’t imagine that there will be another project on the national list that will generate as much revenue, as much GDP, as many high paying jobs as a bitumen pipeline to the coast.”

Continue Reading

Alberta

Alberta Premier Danielle Smith Discusses Moving Energy Forward at the Global Energy Show in Calgary

Published on

From Energy Now

At the energy conference in Calgary, Alberta Premier Danielle Smith pressed the case for building infrastructure to move provincial products to international markets, via a transportation and energy corridor to British Columbia.

“The anchor tenant for this corridor must be a 42-inch pipeline, moving one million incremental barrels of oil to those global markets. And we can’t stop there,” she told the audience.

The premier reiterated her support for new pipelines north to Grays Bay in Nunavut, east to Churchill, Man., and potentially a new version of Energy East.

The discussion comes as Prime Minister Mark Carney and his government are assembling a list of major projects of national interest to fast-track for approval.

Carney has also pledged to establish a major project review office that would issue decisions within two years, instead of five.

Continue Reading

Trending

X