Connect with us
[the_ad id="89560"]

Alberta

Colleagues mourn Edmonton-area health-care aide who died from COVID-19

Published

1 minute read

SHERWOOD PARK, Alta. — A union representing front-line health-care workers says one of its members in the Edmonton area has died from COVID-19. 

The union says Rose Vandelannoite worked as a health-care aide at the Sherwood Park Summerwood Village retirement home, where she was the chief union steward.

Local 3000 of the Laborers’ International Union of North America says she became infected with the novel coronavirus at work in early December and died in hospital on Sunday. 

A fundraising page set up by the union on the online platform Fundrazr had taken in nearly $6,300 by this morning to help Vandelannoite’s family cover funeral expenses.

It says she was committed to her work, devoted to the residents and tireless in advocating for her co-workers. 

The union adds she was a proud mother to two adult children and that many friends and co-workers will miss her. 

Alberta reported the deaths of three other health care workers last week: a health-care aide at a Calgary long-term care facility, a woman in the Edmonton zone whose occupation has not been released and a physician who contracted COVID-19 outside the workplace. 

The union represents nearly 9,000 workers — mostly in front-line health-care fields — in Alberta, Saskatchewan and Ontario. 

This report by The Canadian Press was first published January 12, 2021.  

The Canadian Press

Storytelling is in our DNA. We provide credible, compelling multimedia storytelling and services in English and French to help captivate your digital, broadcast and print audiences. As Canada’s national news agency for 100 years, we give Canadians an unbiased news source, driven by truth, accuracy and timeliness.

Follow Author

Alberta

Loss of Keystone XL pipeline expected to hurt future oilpatch growth: experts

Published on

CALGARY — Western Canada’s oil producers will likely cope better with Joe Biden’s cancelling of the Keystone XL presidential permit than they did with the same move by ex-president Barack Obama in 2015, an industry analyst says.

But Phil Skolnick, a New York-based analyst for Eight Capital, agreed with other observers that the end of the pipeline will stifle investment and production growth for years in the Canadian oilpatch.

Shortly after being inaugurated on Wednesday, President Biden, who was Obama’s vice-president, fulfilled a campaign promise and again took away the pipeline permit that former president Donald Trump gave back to builder TC Energy Corp. in 2019.

The difference between now and five years ago is that producers have two promising alternative pipelines — the Line 3 replacement and the Trans Mountain expansion, together providing nearly one million barrels a day of export capacity — to pin their hopes on, said Skolnick.

And, he added, after more than five years of poor oil prices and a lack of access to capital markets to raise money, their expectations for growing their oil production have been greatly diminished.

“It was worse when it happened in 2015 .. that was bad back then because we didn’t have the big rail buildout and we really didn’t have Line 3, no one really knew about that,” said Skolnick.

“This is bad because (the government of) Alberta spent the money on it but, looking through the lens of the producers, not as big of a deal as some people might think.”

Incremental capacity additions to pipelines, technology that makes oil transport more efficient and crude-by-rail capacity that hit a record of 412,000 bpd last February mean the system will be “pipe neutral”  — with capacity matching demand — in the first half of this year, he said.

TC Energy approved spending US$8 billion in the spring of 2020 to complete Keystone XL after the Alberta government agreed to invest about US$1.1 billion (C$1.5 billion) as equity and guaranteed a US$4.2-billion project loan.

Alberta Premier Jason Kenney has said the province has about $1 billion at risk if the project is killed.

The 1,947-kilometre pipeline is designed to carry 830,000 barrels a day of crude oil from Hardisty, Alta., to Steele City, Neb., where it connects with the company’s existing facilities to reach the U.S. Gulf Coast refining centre.

The two other export pipelines will provide enough capacity to allow oil production to grow into the second half of this decade, said Richard Masson, an executive fellow and energy expert at the University of Calgary’s School of Public Policy.

But uncertainty about future capacity make it impossible for producers to make decisions about new multibillion-dollar oilsands projects, which could take five years or more to plan and build, despite growing demand for heavy oil from U.S. refiners seeing dwindling imports from Venezuela and Mexico.

“It puts a damper on investment expectations,” Masson said, noting that Canadian oil and gas capital spending fell from more than $80 billion in 2014 to about $24 billion last year, a factor in the economic slump gripping the Calgary and Alberta economies.

“For something to be started up after 2025, you really have to start working on it today.”

Excess space in the oil transport system is vital to provide optionality, energy security and stable pricing, said Canadian Energy Pipeline Association CEO Chris Bloomer, who agreed Keystone XL is needed to ensure future growth rather than short-term demand.

“We want to be somewhat long in takeaway capacity and access to markets rather than short, which creates (price) discounting,” he said.

On Wednesday, Kenney warned that Biden’s decision to cancel Keystone XL after construction had already started sets a “precedent” that could put existing pipelines at risk of “retroactive” shutdowns.

But neither Skolnick nor Masson agreed shutting operating pipelines is a likely scenario given the potential damage that could result for oil consumers in the U.S.

Bloomer said that’s not something his members are worried about.

“Existing operating pipelines? The economy would come to a grinding halt and there would be massive devastating economic impacts if that were to happen,” he said.

In early 2016, TC Energy (then called TransCanada) launched legal action against the U.S. seeking US$15 billion in damages under the North American Free Trade Agreement. The claim was withdrawn after Trump was elected.

In a report on Thursday, analysts with Tudor Pickering Holt and Co. said they expect the company to make a similar trade appeal this time, but with damages of US$17 billion to account for spending on the project since then.

The report also suggests TC Energy will likely look to recover some of its losses on the pipeline from the shippers who signed agreements to guarantee space on the line.

The company warned Wednesday it will likely post “substantive” mostly non-cash writedowns in its first-quarter financial results.

Earlier Thursday, TC Energy said it planned to eliminate more than 1,000 construction jobs related to its decision to halt work on Keystone XL. 

The company had previously warned that blocking the project would lead to thousands of job losses.

This report by The Canadian Press was first published Jan. 21, 2021.

Companies in this story: (TSX:TRP)

Dan Healing, The Canadian Press

Continue Reading

Alberta

Calgary man appeals conviction for drunk-driving crash that killed his daughter

Published on

CALGARY — A Calgary man who killed his daughter and seriously injured her best friend in a drunk-driving crash is appealing his conviction and sentence.

Michael Shaun Bomford was found guilty last January of dangerous driving causing death and bodily harm, as well as causing the 2016 crash while impaired.

He was sentenced to 5 1/2 years in prison.

Bomford has filed an appeal that claims the sentence was excessive and unreasonable in the circumstances.

He also suggests the trial judge erred by ruling hearsay text messages admissible at trial.

Bomford is serving his sentence at the Drumheller Institution in Alberta.

Court heard Bomford had three times the legal limit of alcohol in his system when he took his 17-year-old daughter, Meghan, and her friend, Kelsey Nelson, to get police checks so that they could become junior ringette coaches. 

His daughter did not survive the crash, while Nelson suffered a severe brain injury and has no recollection of it.

Bomford’s trial heard that he lost control of his Jeep while driving 112 km/h in an 80 km/h zone. The Jeep rolled into the median and all three occupants were thrown out of the vehicle. (CTV Calgary)

This report by The Canadian Press was first published Jan. 21, 2020.

The Canadian Press

Continue Reading

Trending

X